Wire Panel Update
With the new layout, I’ll only need 1 logic board to run the 8 signal heads I’ll need instead of the previously planned two. So I decided to move the 1 circuit board (that was in a panel all by itself) over to the primary panel.
I removed the DCS100 booster itself because I plan to mount this under the layout near the panel so it’s in an open spot for better airflow and heat ventilation. Only 4 wires will need to be run from the booster into the panel (Rail A, Rail B, DCC Ground, Loconet).
Here’s a look at the new signal wiring, and the whole panel.




