Home > Track > Bridge Track

Bridge Track

February 10th, 2010

Finished up the track for the double track truss bridge.  Since the track is going to be permanent inside the bridge once installed on the layout, I went ahead and did some weathering on the track now.

After assembling the track with guard rails and side rails, I spray painted the whole thing Rail Brown.  After that dried, I went back over the ties with a Floquil Rail Tie Brown pen and then finished up by cleaning the top of the rail with a brightboy. Turned out pretty well.  Using the paint pens made painting the ties a breeze.

Track

  1. No comments yet.
  1. No trackbacks yet.